|
|
 |
 |
 |
 |
Production of operation manuals |
 |
One of our clients hired us to produce visualized operation manuals on their Wireline operations. We sent out two project engineers who followed and photographed the operations day and night. They took notes and conferred with the personnel to gather information for the manuals. When our personnel came onshore they produced the manuals in cooperation with our graphical designer. The manuals then went through a thorough quality check and revision together with professionals and where then delivered. |
Implementation of visualized drops manuals |
|
A rig contractor wanted to improve and standardize potential dropped objects inspections on their 3 drilling rigs. We sent out 2 project engineers on their installations, they conducted a light survey and photographed the equipment with most potential for dropped objects. The derrick, all drilling and pipe handling equipment, pipe deck, moon pool and deck cranes became focus areas. Visualized inspection routines where produced for all risk equipment in each of these areas. The inspection routine was then implemented in their maintenance system. |
Our collaborating partners |
|
|
 |
|
 |
|
|
|